Compare
Multichoice installer payments vs ParcelNow vs CV Coach
The problem, what was built, the stack and the outcome, next to each other.
Clear · Up to 3 at a time
In common
- Shared stack: none in common
- Order: ParcelNow (2025 – 2026) → CV Coach (2025 – present)
Swipe sideways to compare ›
Multichoice installer payments ›
R5M+ paid to installers in the first six months
ParcelNow ›
On-demand parcel delivery with real-time tracking
CV Coach ›
AI CV analysis, job matching and tailored applications
At a glance
- Role
- Integration engineer
- When
- Delivered
- Length
- —
- Status
- Delivered
- Type
- Platform
- Role
- Technical lead, Smart Kitchen Co
- When
- 2025 – 2026
- Length
- 1 yr
- Status
- Delivered
- Type
- Web, Platform
- Role
- Founder / Lead Engineer
- When
- 2025 – present
- Length
- 1 yr 9 mo so far
- Status
- MVP
- Type
- AI, Web
The problem
Integrated the installer management system into Multichoice's payment process so installers are paid accurately and on time.
Customer and operations dashboards with backend services for parcel lifecycles, tracking events and notifications, built for high-throughput transactional workflows.
A Chrome extension captures job ads; a LangGraph workflow parses the CV and the ad, scores the match and drafts tailored cover letters and CV revisions.
What was built
—
—
A Chrome extension captures advertisements, stores them in PostgreSQL and queues analysis. The platform compares a CV with a job description, produces a structured match score and generates tailored cover letters and CV revisions.
Stack
- Payments integration
- Next.js
- FastAPI
- PostgreSQL
- Redis
- Docker
- FastAPI
- Next.js
- Supabase
- LangGraph
- LangChain
- Celery
Highlights
- Processed over R5 million in installer payments within six months
- Next.js dashboards over FastAPI services
- Live delivery updates through logistics and messaging integrations
- LangGraph workflow with custom tools to parse, compare evidence and score the match
- Asynchronous analysis pipeline
Infrastructure choices
—
- Docker-based development and deployment standards
—
Outcome
Over R5 million in installer payments processed within six months.
—
—